Microsoft Project 2013 Interview Questions - Jul 17, 2022

fluid

Microsoft Project 2013 Interview Questions

Q1. Explain what's hyperlink task in MS undertaking used for?

Ans: As the name shows, hyperlink assignment in MS challenge is used for linking any two obligations in a undertaking.

Q2. Mention in which is “precis venture” in MS project?

Ans: Summary assignment is beneficial in estimating the task length and the period in task, and organizing the mission in order.  

Q3. List out the categories of responsibilities used in MS undertaking?

Ans: There are principal 4 forms of duties:

Summary obligations: It includes subtasks and their associated residences

Subtasks: It is a smaller venture which can be part of a precis challenge

Recurring duties: These are the obligations that falls at ordinary durations

Milestones: These are the high priority venture which might be adjusted to 0 duration and are like quick-time period dreams within the challenge

Q4. Mention what are the new features available in MS challenge 2013?

Ans:

Improved reporting equipment: MS mission 2013 offers advanced reporting tools and smooth accountability for organizations

Office 365 Integration: Easy integration of office 365 to the MS challenge records

New Project Templates: The new MS project presents project templates that can be compliance in your requirement like advertising and marketing, production, enterprise, software development plan, and many others.

Better Presentation Tools: The timeline view offers higher view of the progress of your assignment and enables to time table your project accordingly

Task Path: This characteristic can be on hand for a mission manager managing massive and complicated schedules. It allows the user to see the path for a selected challenge which includes Successors, Driven successors, Predecessors and Driving Predecessors.

Q5. Explain what is a constraint in MS venture? What are the sorts of constraint available in MS undertaking 2013?

Ans: In MS challenge, constraint is used for scheduling the assignment and setting a due date for the venture.  The types of constraint to be had in MS undertaking are

As soon as possible

As overdue as possible

Must begin on

Must finish on

Finish no later than

Start no later than

Start no in advance than

Finish no in advance than

Q6. Mention a way to set a closing date in MS project?

Ans: To set a cut-off date in MS assignment

Double-click on a challenge -> it will open a venture statistics conversation container

Now, click on at the advanced tab

Then click on the arrow in the deadline field to show the calendar after which choose a date

Now save this by using clicking on the store button

Q7. Explain how you may flow obligations in task 2013?

Ans: You can move tasks in MS assignment 2013 with the aid of two strategies

Move the project with drag and drop approach

Move the challenge with the cut and paste method

Q8. Explain how you may dispose of aid out of your mission?

Ans: To dispose of the aid out of your undertaking, first clear out the venture list to view handiest the duties to which the resource is allocated, after which you may edit or exchange each mission to update that resource.

Choose a venture-orientated view like Gantt chart and cover the summary responsibilities, this listing will show best work obligations and milestones

Under View tab’s records section, click at the filter out drop-down listing and then choose “Using Resource.”

In the “display duties the use of” drop-down list, pick out the aid and delete it that you don’t want and then click good enough

To update the useful resource, choose “Assign Resources” below resource tab’s undertaking section. Select the assignment from the desk you want to re-assign, and then, in the Assign resource conversation container, pick out the resource you need to replace and click replace

Click the layout tab, and turn the checkbox returned on for “Show Summary Tasks.”

Click resource sheet within the view tab’s useful resource view phase and now you can delete the aid

Q9. Mention what is the characteristics of Gantt Chart Basics?

Ans:

In Gantt chart, each venture is displayed by one row

Dates are displayed in incremental order like days, weeks or months as per the entire length of the mission

For every task expected, time is displayed with the aid of a horizontal bar whose left quit shows the anticipated starting of the task and proper cease indicates the expected completion date

Task may additionally run parallel, sequentially or overlapping

The chart is represented inside the bar formation to a period proportional to the fraction of the work that has been finished

On the left of the line, you'll see the finished responsibilities

Future obligations line lies to the right of the road

Current assignment are move the road and are behind schedule when crammed in segment is at the left of the road and beforehand of schedule while it is right of the road

Q10. Explain what's the usage of paintings contour in MS challenge? What are the specific sorts of contour you operate in MS venture?

Ans: In MS task paintings, contour presentations the distribution of running hours over the duration of the task.  The graph will display the peak according the work distribution over the week.

Flat: Such contour indicates an excellent distribution of labor

Back-loaded: It will show the peak hobby at the give up of the assignment

Front-loaded: It will display the height running activity at the outlet of the challenge

Double top: It will display two fundamental durations of height hobby

Early peak: It is same because the front loaded however with the upward push to top pastime

Late height: It is same as a back loaded contour with a ramp

Bell: It suggests a unmarried height within the principal of the undertaking

Turtle: A bell with a ramp up and down

Q11. Explain how you may layout a Gantt chart on MS mission?

Ans: To format a Gantt chart on MS project

First you have to click on on Format icon from fundamental menu bar

Click customise brief access toolbar, that's final on the nook above menu bar

-> click on greater additives ->  select on, comments now not in pattern

-> click on Gantt Chart Wizard and then click upload and adequate

Once Gantt chart wizard setup, it'll open a window that displays numerous putting like standard, important direction, baseline and other on your Gantt chart. You can choose alternative in line with requirement and click subsequent

Likewise, you can additionally set records like resources and dates, assets or dates by myself

Once you go out wizard, simple formatting like colour, font length and appearance can be modified from the main menu ( FORMAT) itself

Q12. Explain how you can hyperlink duties in MS challenge 2013?

Ans: You can link or connect any two duties in a venture to appear their relationship, also referred as dependency. Dependency drives  the mission agenda and as soon as you exchange the duties, each alternate you make to one regulate the task of other, which influences the subsequent and so forth.  To hyperlink the challenge, you have to

Click View -> Gantt Chart

Hold down Cntrl and click the two duties you want to hyperlink

Click on Task -> Linked the chosen tasks

Q13. Mention the kinds of mission links in MS project 2013?

Ans: There are 4 kinds of task hyperlinks in MS task

Finish to start hyperlink: In this hyperlink the second challenge can't be initiated until the primary undertaking is completed

Start to begin hyperlink: In this link, the second project can start at any time after first venture is initiated

Finish to finish hyperlink: In this hyperlink,  venture does now not need to end on the identical time, the second assignment can end every time after first assignment is ended

Start to finish link: In this link, the second one task can’t finish till the first assignment starts.

Q14. Explain what is resource levelling?

Ans: Resource levelling is the good characteristic given by means of MS project; those tool schedules paintings with out over allocating paintings to the employees, especially for individuals who are indulged in multi-undertaking activities.  For instance, there's a mission A and B and allotted time for this mission is 3 and 2 days. When an person use resource levelling, it agenda the paintings as first 2 days for the undertaking A and later  days for undertaking B and once more at the last day it'll go back to undertaking A.

Q15. Explain how you may create and code a WBS (Work Breakdown Structure) in MS undertaking?

Ans:

Inserting Tasks: If you forgot to insert assignment within the list you could upload by using clicking the region whee you want to feature a undertaking and visit “Insert>New” mission or press “insert.”

Outlining Structure: You will be growing an define of the assignment via assigning the venture call. In appreciate to try this you need to pick all deliverables beneath the heading after which click the Indent button. They will all line up, and the deliverable will appear in bold

Assign numerical code to responsibilities: Once you have got created a work breakdown, you may assign a numerical code to it. In recognize to do this visit “gear” in the undertaking bar. Under “alternatives”, you'll see “define options”, beneath this you need to click on on test container with the option “display outline range”. You will see that the undertaking list may have a numerical code in front of it.

Q16. What ought to you be aware of earlier than importing excel document to MS project?

Ans: Before you import excel document, you must be privy to following things

Make certain which excel file fields will be mapped to which MS project

Not essential that all fields within the excel have to be imported to MS mission, you've got the possibility to pick the field you wanted to import

Make positive that your import report has a column header

Blank fields inside the excel may be imported as a blank field the undertaking

Start and finish date in excel might be imported in the MS venture begin and finish discipline as begin no earlier than constraints for the tasks

If the map has to imported then, it ought to in Global.Mpt file format to your system, if it isn't in that layout then import wizard will nod show the map as choice choice.

Q17. Explain the route for uploading excel into the MS assignment 2013?

Ans: Path for importing the document into MS mission:

At the quit of the run wizard, it'll ask the way you need to import the document

As a brand new task

Append the statistics to the energetic challenge

Merge the records into the energetic venture

After deciding on any of the above alternatives, you can click on next to complete uploading excel file to MS   project.

Q18. Explain how you could examine finances useful resource values in MS project?

Ans:

Go to Resource Usage view ( View -> Resource Usage)

Add price range cost, Work, finances work and Cost columns to the table if they're now not there already

Tap on the drop down arrow to the proper of the Resource Name column heading and then pick “Group through” -> Custom group,  a good way to organization the useful resource via custom aid check subject

Tap at the down arrow within the Field Name cellular within the Group By row segment, after that within the drop down list of resource fields, choose the call of the custom textual content field in your price range categories after which click follow

Now inside the organization precis rows, compare the price range get fee or budget work values to the value or work values simultaneously

To dismantle the organization, you can pick out NO businesses by way of clicking down arrow to the proper of the Resource Name column heading

Q19. Explain what are the putting you need to insert whilst entering Project Information into Project 2013?

Ans: To input assignment records into mission 2013, it consists of information like

Start and Finish Date: For a project this is scheduled ahead from the start date, input most effective the begin date, whilst enter the finish date if you want to time table backward from finish date

Schedule From: You can select the finish date or start date whichever way you need to time table your challenge

Current Date: By default this putting matches the pc clock settings; but it could be configured according to your requirement

Status Date: To track the progress at the venture you can the current date popularity. This will show the status of the mission as of the cutting-edge second

Calendar: From this drop-down listing you can select the bottom calendar template to apply for the undertaking calendar

Priority: By the use of this field you can prioritize your work and decide which paintings has to be not on time and which needs to be completed without delay

Q20. Explain a way to set work time exception in Project 2013?

Ans: To alter the available operating hours in Project 2013 for a specific day, you have to exchange the work time exception settings. In order to try this

Select the mission and exchange the operating time

On the calendar choose the day you need to change

Click the exception tab to show it, it's going to display a column with the name cell in a clean row, type a call for the exception and press enter

Tap the exception name you entered in step three after which click on the information button. It will open a element conversation container for this exception. Where you'll make the setting in step with your requirement like working time, recurrent pattern and range of recurrence.